Illustration of green under-tile waterproofing being detailed at an apartment bathroom wall-floor junction beside a drain
Membrane application · Before protective covering Illustrative scene See the real trial photos

HDB · Condo · Landed bathrooms

Toilet & bathroom waterproofing in Singapore.

Protection starts beneath the tiles.

Plan the membrane, drain details and flood test before re-tiling. Send us your bathroom photos to discuss the next step.

First response within one working day

Updated: November 2026

Quote on WhatsApp

Want a price for your toilet? WhatsApp three photos and the size.

  1. The whole floor, from the door
  2. The floor trap and the shower wall
  3. The size: "one HDB toilet", or the m²
WhatsApp the photos Prefer a form? Send the brief

WhatsApp is answered every day, 8:30am to 10pm, usually within an hour. Rayson recommends an applicator from its network, who inspects, quotes and installs.

The short answer

Hack, membrane, flood test, tile. In that order, every time.

A Singapore toilet or bathroom is waterproofed beneath the tiles. After hacking, a liquid membrane is rolled across the whole floor, into the floor trap, around every pipe and up the walls, flood-tested for 24 hours and only then tiled. Rayson SealForce PU510-W is the one-part, water-based membrane for that layer, applied in two coats at 0.4 mm wet film. Renovation platforms' guides checked in November 2026 put the basic works of one HDB or condominium bathroom, hack, waterproof and tile, at about S$3,000 to S$9,000. Rayson specifies and supplies the membrane; Rayson recommends the job to an applicator in its network, who assesses, quotes, installs, flood-tests and re-tiles; in an HDB flat the applicator must be on the HDB Directory of Renovation Contractors.

What happens when you WhatsApp us

Four steps from your photos to a quotation you can compare.

  1. 01
    Reply within one working day

    Send three photos: the floor and the trap, the walls around the shower, and any stain on the ceiling below. Tell us the property type and whether the bathroom is being renovated.

  2. 02
    An applicator in the Rayson network inspects and flood-tests

    The flood test says whether the membrane beneath has failed or water is only weeping through grout, which decides between hacking and a lighter repair before anyone quotes.

  3. 03
    A written quotation with every line spelt out

    The membrane and its coats, the turn-up height, the detailing at the trap and pipes, the flood test, what hacking and tiling are included, the programme and the hours. The published ranges to compare it against are on the toilet waterproofing cost page.

  4. 04
    Two warranties, in writing

    Rayson's three-year material warranty on SealForce PU510-W, and the workmanship warranty set out in the quotation from the applicator.

Start with your situation

Four bathrooms, four different first steps.

Each one ends at the same membrane. What changes is what has to happen before it goes on, and who has to agree.

01 / RENOVATING

An HDB or condo toilet being hacked and re-tiled

The clean case. Hacking under the HDB permit, the membrane the day after, the flood test the day after that, then the tile bed. Budget about S$3,000 to S$9,000 for the basic works, before fittings.

See the sequence 
02 / LEAKING

Water seepage or a drip on the ceiling below

Usually a toilet leak from the flat above: the failed detail is up there, so the repair happens up there. In an HDB flat the cost is shared under HDB’s scheme; in a condo the strata law presumes the unit above.

Ceiling leak: find the source and the repair 
03 / NEW FLAT

A BTO under three years old

HDB restricts hacking the wet-area tiles for the first three years to protect the original waterproofing and its warranty. Overlay is the compliant route: the new tiles bond to the old on a slurry coat of SealForce LX560-W latex additive, and the membrane beneath stays untouched.

How long the membrane lasts 
04 / LANDED

Bathrooms, balconies and the car porch

The bathrooms inside fail at the same five details. Balconies and the porch are wet areas open to the sky, and take the same membrane under screed and tiles.

The landed-home guide 

The job, step by step

Before the tiles. Look at the details.

Hougang HDB toilet · September 2026 · SealForce PU510-W pre-launch trial photographs

Prepare before coating

Remove old finishes and loose material under the applicable permit. Check drainage falls, repair cracks and leave the substrate clean and dry.

Before application. The photographs below record the membrane and flood-test stages.
Hougang toilet trial photograph showing green membrane across the floor and turned up at wall junctions

One continuous layer. Details included.

The membrane covers the floor and turns up at the wall junctions. Pipes and outlets must be detailed as part of that same waterproofing layer.

Four details to inspect

Trial photograph of membrane around the soil-stack base and adjoining wall-floor junction

The stack and corner

Check continuity around the pipe base and into the wall junction behind it.

Trial photograph of membrane at the raised outlet collar and wall turn-up

The outlet and upstand

Inspect the membrane around the outlet collar and its connection to the wall turn-up.

Trial photograph of the green membrane surface around two pipe openings

The film and weak spots

Check for pinholes, thin areas and gaps around penetrations before the flood test.

Trial photograph of standing water over the toilet membrane during a flood test

The flood test

After the specified curing period, test for leakage before covering the membrane.

Test first. Protect the membrane next.

Review the flood-test result and address defects before adding the specified protective screed, render or tile bed. PU510-W is not an exposed walking surface.

Read the SealForce PU510-W TDS (PDF)

Controlled pre-launch trial documentation, not a completed-project claim or proof of long-term performance. SealForce PU510-W is part of Rayson’s upcoming release.

The numbers

What it costs, how long it takes, what the membrane takes.

Market ranges from Singapore renovation platforms' guides, none of them installers, checked on 8 November 2026; not Rayson quotations. The material lines come from the SealForce PU510-W data sheet.

WHAT IT COSTS · PER TOILET
Membrane line within a renovation
S$400 – 1,500
Basic works: hack, waterproof, tile
S$3,000 – 9,000
No-hack repair from above
After a flood test
Making good a spalled ceiling below
S$300 – 1,200
The full cost tables and their sources 
HOW LONG IT TAKES
Hacking, on HDB weekday hours
1 – 3 days
Membrane, two coats
1 day
Flood test after the final coat
24 h, held a day
Then screed, tiles, grout
Within the permit window
The day-by-day guide 
WHAT THE MEMBRANE TAKES
SealForce PU510-W, two coats
0.4 mm wet film each
Consumption per coat
About 0.56 kg/m²
A typical toilet with turn-ups
8 – 12 kg, under one 20 kg pail
Material warranty
3 years against defects
SealForce PU510-W TDS (PDF) 
Renovation permitHacking and re-tiling in an HDB flat need a permit through a registered renovation contractor; the permit fixes the demolition days.
Noisy work hoursHacking, removing finishes and cutting tiles: weekdays 9 am to 5 pm only, never Saturdays, Sundays or public holidays.
New flatsNo hacking of bathroom wall and floor tiles for three years from key collection; it voids the waterproofing warranty. Overlay instead.
Ceiling leaks and seepageThe slab between two flats is shared. HDB’s Goodwill Repair Assistance scheme co-pays half; the owners share the rest. Verify the current terms with HDB.
Published system evidence

One membrane for the tiled wet area. Two more for what sits beside it.

Starting routes, not a specification. Open the data sheet before committing to preparation, film build or timing.

SealForce PU510-W wet-area waterproofing membrane, 20 kg pailTOILET + BATHROOM / ONE-PART, BENEATH TILES

SealForce PU510-W

One-part, water-based, polyurethane-modified membrane rolled straight from the pail in two coats at 0.4 mm wet film. No primer, no mixing, low odour in an occupied home. Elongation of at least 150%, bridges a 2 mm crack, flood-tested 24 hours after the final coat and protected by the tile bed.

SealForce PA525-S polyurea membrane, Part A and Part B pailsDECKS + PLANT ROOMS / TWO-COMPONENT

SealForce PA525-S

Two-component, roller-applied polyurea-based membrane with elongation above 500% for decks that carry vehicles, plant-room floors and heavier-duty wet areas.

PatchBond EP220 epoxy repair compound, Part A and Part B packsCRACKS, VOIDS AND FILLETS / REPAIR

PatchBond EP220

Non-sag epoxy repair compound for reinstating cracks and voids and forming the fillet at the wall–floor junction before the membrane goes on.

Hack, or no-hack?

The honest answer depends on one test.

Is the membrane under the tiles sound? No-hack is honest when a flood test holds, the ceiling below stays dry under test, and the symptom is water weeping through grout or a cracked tile; re-grouting, a grout sealer and replacing the cracked tile address the actual fault. Hacking is unavoidable when the flood test fails, the leak tracks to the trap, a pipe or the wall junction, or the membrane was never installed, which in older flats it often was not. A failed HDB or HIP water test means water is already under the tiles, which puts the bathroom in the second case.

A contractor who quotes for hacking without a test, or for a sealer without one, is guessing with your money. The contractor guide sets out what a quotation for this work must show, and the wet-area guide goes through the five details where nearly every Singapore bathroom leaks.

Ready for a useful first review?

Show us the toilet, and the ceiling below it.

Send photographs of the floor, the trap, the shower wall and the threshold, and of any stain or drip underneath; the age of the bathroom; whether it is HDB, condo or landed; and your renovation dates. We respond within one working day, including when the honest answer is a re-grout rather than a hack.

Frequently asked questions

How much does toilet waterproofing cost in Singapore?

Renovation platforms' guides checked in November 2026 put the waterproofing membrane line at S$400 to S$1,500 within a bathroom renovation, hacking and disposal at S$400 to S$1,500, tiling at S$1,500 to S$6,500, and the basic works of one bathroom, hack, waterproof and tile, at about S$3,000 to S$9,000 before fittings. A no-hack repair from above is quoted only after a flood test. The membrane material is the small part: two coats of Rayson SealForce PU510-W on a typical toilet with its turn-ups take about 8 to 12 kg, under one 20 kg pail.

How long does toilet waterproofing take?

Hacking one to three weekdays, because HDB permits noisy work only on weekdays from 9 am to 5 pm and fixes the demolition days in the renovation permit; the membrane one day, in two coats a few hours apart; the flood test the following day, 24 hours after the final coat; then the screed, tiles and grout. On the Hougang trial application of SealForce PU510-W photographed in September 2026, the membrane was complete the day after the approved hacking window closed and the flood test was under way the next afternoon.

Can my toilet be waterproofed without hacking the tiles?

A membrane cannot be applied over tiles: SealForce PU510-W goes onto the prepared screed beneath them. A no-hack treatment is honest only for a narrow set of faults, such as water weeping through grout over a membrane that is still sound. If the bathroom has failed an HDB or HIP water test, water is already under the tiles, and injections or surface sealers buy months, not years. An assessment with a flood test tells you which case you have before anyone quotes for hacking.

What is the flood test, and how long is it held?

After the final coat has dried for 24 hours and before any screed or tile goes down, the floor trap is plugged and the whole floor is flooded to a set depth and left for a full day while the ceiling below and the adjoining rooms are checked. It is the only proof that the membrane works. A quotation that does not include it is missing its most important line.

My BTO flat is under three years old. Can the toilet be hacked?

HDB restricts the hacking of bathroom and toilet wall and floor tiles in new flats for the first three years from key collection, to keep the original waterproofing and its warranty intact; hacking inside that window voids the waterproofing warranty. The compliant route is an overlay that leaves the tiles and the membrane beneath them undisturbed: the new tiles are bedded on a slurry coat of Rayson SealForce LX560-W latex additive, 1 part LX560-W to 1 part cement and 1 part sand, brushed onto the cleaned and abraded old tiles and tiled while still wet. Confirm the current terms on HDB's renovation guidelines before you plan.

Who pays for a ceiling leak or water seepage from the toilet above?

In an HDB flat the floor slab between two flats is a shared structure, and HDB's Goodwill Repair Assistance scheme has been described in HDB's own letters as co-paying 50% of the repair cost, with the remaining half shared equally between the upper and lower owners and HDB arranging the contractor once both agree. In a condominium the strata law presumes the leak comes from the unit above unless proven otherwise, and both owners investigate jointly with the management corporation involved where needed. The repair is always done from the toilet above.

How high must the membrane go up the walls?

The practice Singapore specifications follow, drawn from the BCA good industry practices guide for internal wet areas, carries the membrane up every wall well above the finished floor, with about 300 mm as the common minimum, and to around 1,800 mm or full height on the walls that shower water strikes. It also rises behind the door threshold or kerb, and is dressed into the floor trap and up every pipe sleeve.

Which Rayson product is used, and how much does a toilet need?

Rayson SealForce PU510-W, a one-part, water-based, polyurethane-modified membrane rolled straight from the pail in two coats at 0.4 mm wet film each. A typical 3 m² toilet with 300 mm turn-ups and a shower wall to 1.8 m takes about 8 to 12 kg, under one 20 kg pail. Where the wet area is heavier duty, a deck that carries vehicles or a plant-room floor, the two-component polyurea SealForce PA525-S takes over. Above the membrane, SealForce LX560-W latex additive mixed into the screed, tile bed and grout makes them stronger and more water-resistant.

What warranty do I get?

Two separate warranties. Rayson warrants SealForce PU510-W against manufacturing defects for three years from the date of supply, provided the material is applied per the technical data sheet and the membrane is flood-tested before it is covered; the remedy is replacement material. The applicator sets out the workmanship warranty in its own quotation; in an HDB flat that applicator must be on the HDB Directory of Renovation Contractors. Ask for both in writing.

Who does the work, Rayson or a contractor?

Rayson recommends the job to an applicator in the Rayson network, who quotes and contracts it with you directly. The applicator inspects the bathroom, hacks, prepares, applies the membrane, flood-tests and re-tiles, under the workmanship warranty in its own quotation. In an HDB flat the applicator must be on the HDB Directory of Renovation Contractors, so Rayson recommends a listed one. Rayson manufactures and supplies the membrane and publishes its technical data. Send us photographs of the toilet and of any stain below and we will specify the system and arrange the inspection.

Not sure which system fits your project?

Tell us your surface, area and timeline — our Singapore technical team will recommend a practical system and reply within one working day.