Reviewed: September 2026

Seamless commercial kitchen resin floor with visible texture, drainage channel and low raking light
Commercial Kitchen Flooring Singapore

Commercial kitchen flooring in Singapore, engineered for heat, grease and wash-down.

Cooking lines, dishwash areas and prep corridors face different loads from heat, oil, water and traffic. Rayson defines the exposure zone first, then builds the PU-cement or epoxy flooring system around it.

Formulated in SingaporeZone-specific guidanceOpen technical data
The short answer

A kitchen floor should be selected by exposure zone—not by one material everywhere.

Hot production, continuous wash-down and drier prep corridors do not ask the same thing of a floor. Define heat, grease, cleaning, drainage, trolley traffic and the available closure window first; then decide which zones take a PU-cement screed and which take an anti-slip epoxy flooring route.

Best fitRestaurants, hotels, central kitchens, F&B back-of-house, dishwash, wash bays and prep corridors.
Resolve before coatingGrease contamination, loose tiles, hollow screed, failed waterproofing, ponding falls and active movement.
Specify by zone

Choose the kitchen zone. See what the floor must solve.

The visual, system direction and technical brief change together with your selection.

01 / HOT COOKING LINE

Where heat and fats concentrate, assess the more substantial resin-screed route.

Wok lines, ranges and fryers face hot spills, grease films and heavy fixed equipment. PurScreed PC70 is the PU-cement direction to evaluate further; final texture, detailing and suitability must be confirmed against the site and TDS.

  • Hot oils and organic fats
  • Equipment feet and trolley loads
  • Coving and drainage details
PRELIMINARY SYSTEM DIRECTIONPurScreed PC70 system direction
Send hot-line details
Dark grey textured resin floor beside a commercial cooking line, stainless drain and trolley wheel
Compare the duty first

Two routes, with clear operating boundaries.

Confirm the final system, thickness, aggregate profile and return-to-service plan against the actual substrate, site conditions and relevant TDS.

01

PU-cement screed direction

Hot lines, wash-down and heavier wet duty
  • Four-part water-based system
  • 1.5–3 mm application thickness
  • Medium-to-heavy-duty direction
PurScreed PC70
02

Anti-slip epoxy flooring direction

Prep, service, dry stores and lighter duty
  • Solvent-free epoxy finish
  • Smooth or aggregate-textured finish
  • Compatible primer over prepared substrate
FloorGuard R50

In a commercial or central kitchen the two routes usually run side by side: epoxy flooring with a selected anti-slip aggregate along prep, service and dry-store routes, and a PU-cement screed where hot spills and repeated wash-down take the duty beyond an epoxy’s comfortable range. Confirm where the boundary falls, zone by zone, before either route is priced.

System build-up

Every layer has a job—and public data to inspect.

01 / HOT + WASH-DOWN DUTY

PurScreed PC70

  1. PU-CEMENT SCREEDPurScreed PC70PurScreed PC70 TDS (PDF)
  2. PREPARED SUBSTRATEMechanically prepared concrete

    Degrease, remove failed layers, and resolve cracks, hollows, falls and drainage details.

Confirm the final system, thickness, aggregate profile and return-to-service plan against the actual substrate, site conditions and relevant TDS.

Hygiene by detail

The hardest place to clean is rarely the middle of the floor.

Wall bases, drains, equipment plinths and texture determine whether wash water leaves—and whether residue has somewhere to collect.

01

Coved wall base

Carry the floor up the wall base to reduce dirt-trapping corners.

02

Drain perimeter

Resolve channels, outlets and falls so wash water does not pond.

03

Equipment plinths

Maintain continuity around feet, bases and service penetrations.

04

Zoned texture

Wet-oily zones need grip; trolley routes must remain cleanable.

Before installation

Kitchen renewal starts with contamination and the closure window.

Surface preparation before coating
01

Map grease contamination

Degrease and mechanically prepare first; never trap contamination below a new coating.

02

Remove failed material

Loose tiles, hollow screeds and peeling coatings are repaired—not hidden.

03

Resolve drainage details

Check falls, channels, wall bases, plinths and any waterproofing problem.

04

Programme from the TDS

Zone isolation, ventilation, cure and reopening follow the selected data and real site conditions.

Published system evidence

Product, purpose and TDS—kept together.

Consultants, contractors, facilities teams and procurement can inspect the same public technical information.

Start the technical brief

Show us the floor, the kitchen zones and the closure window.

Your first message does not need to be a full specification. These four facts are enough to start a useful system discussion.

  1. 01Areas for cooking, prep, wash, stores and corridors
  2. 02Existing floor and visible failures
  3. 03Cleaning routine, grease, heat sources and drains
  4. 04Available installation and return-to-service window
Before you specify the kitchen floor

Which chemistry, and what a quotation must show.

What the licence asks of the floor

SFA's floor requirements for a licensed kitchen, and how the system meets them.

The Singapore Food Agency's conditions of licensing for food establishments, updated 1 January 2026, set the floor specification before any product is chosen. Floors must be built of durable, impervious, non-toxic, non-absorbent and crack-resistant materials; they must be non-slip and easy to clean, coved where the floor meets the wall, graded to floor traps or drains so no water stands, and resistant to whatever contacts them. Cold stores need heavy-duty non-slip flooring, and a licensed non-retail establishment needs SFA's approval of plans before altering the premises. Food shops follow the same principles under SFA's pre-licensing checklist: a graded, coved, impervious kitchen floor.

  • Impervious, crack-resistant, easy to clean: a seamless resin floor rather than tiles and grout; PU-cement on the hot wash-down line, anti-slip epoxy on the drier zones.
  • Coved and graded: the cove and the falls to the drain are formed in the screed and the system, not added afterwards.
  • Non-slip: a textured finish with a stated wet slip rating under SS 485:2022, not just the word anti-slip, confirmed by a wet pendulum test on the finished floor; the anti-slip flooring page explains how texture is specified by zone.
  • Resistant to what contacts it: hot water, steam, fats and cleaning chemistry decide the chemistry; see the epoxy, PU and PU-cement comparison.

Sources: SFA Conditions of Licensing for Food Establishments; SFA Food Shop Pre-Licensing Requirements; Sale of Food (Non-Retail Food Business) Regulations. Checked 26 September 2026; confirm the current conditions with SFA for your licence class.

Frequently asked questions

What is the best flooring for a commercial kitchen in Singapore?

There is no single best build for every zone. Hot cooking lines and repeated wash-down normally require a more substantial PU-cement direction, while drier prep and service routes may suit a properly primed epoxy flooring system with an aggregate texture selected for the actual slip risk.

Can epoxy flooring be used in a commercial kitchen?

Yes, on the right zones. Commercial kitchen epoxy flooring is the route to assess for drier prep, service, dry-store and corridor areas, applied over a compatible primer with an aggregate texture chosen for the actual slip risk. It is not the route for hot cooking lines and continuous wash-down, where hot spills and steam take the duty past an epoxy and a PU-cement screed is evaluated instead.

Is PU-cement better than epoxy for a commercial kitchen?

PU-cement and epoxy solve different duties. Rayson PurScreed PC70 is the PU-cement direction to evaluate for hot, wet and heavier-duty kitchen zones. PrimeBond E25 with FloorGuard R50 is the epoxy flooring route to assess for lighter prep, service and dry-store areas. The site conditions and each product TDS govern the final choice.

What flooring suits a central kitchen?

A central kitchen is normally specified zone by zone rather than as one floor. Cook lines, kettle and wash areas are assessed on the PU-cement screed route; central kitchen epoxy flooring suits the drier packing, chilled assembly, dry-store and circulation routes, with texture selected per zone. Map the layout, exposure and closure window before either route is priced.

Is there such a thing as a HACCP-approved floor?

No. HACCP is a food-safety management system that audits the facility, not a certification that a flooring product carries. What an auditor looks for in the floor is that it is seamless, non-absorbent, coved at the wall junction, drained to falls, cleanable at the temperatures and chemicals the kitchen uses, and free of cracks or open joints where residue can sit. Rayson PU-cement and epoxy kitchen systems are specified for HACCP-audited facilities on exactly those points; the audit outcome depends on the installed floor, the detailing and the cleaning regime, not on a label.

How is a kitchen floor made slip-resistant when it is wet or oily?

Slip resistance is developed through the selected surface texture and aggregate profile. More texture can improve grip but also changes cleanability and trolley movement, so it should be specified by zone rather than applied at one level throughout the kitchen.

Do commercial kitchen floors need coving?

Coving is commonly considered where a seamless, cleanable junction is required at wall bases and equipment plinths. It reduces sharp dirt-trapping corners, but the exact detail must be coordinated with the substrate, wall finish, drains and equipment bases.

Can resin flooring be installed over existing kitchen tiles?

Only after the existing finish and substrate have been assessed. Loose tiles, hollow areas, grease contamination, failed screeds and trapped moisture cannot be hidden beneath a new coating. Unsound material must be removed and the substrate properly prepared.

What causes commercial kitchen floor coatings to fail?

Common causes include grease left in the substrate, coating over weak or hollow material, incorrect falls around drains, incompatible layers, insufficient preparation and reopening before the selected system has completed its required cure.

Can a working kitchen floor be renewed in phases?

A phased programme may be possible by kitchen zone or available closure window. Isolation, preparation sequence, ventilation, cure and return to service must be planned from the selected product TDS and the actual operating conditions.

Which Rayson products are relevant to commercial kitchen flooring?

PurScreed PC70 is the PU-cement direction for evaluation in hot and wet duty. PrimeBond E25 and FloorGuard R50 form an epoxy route for suitable lighter zones. GripSafe AP12 is a specialist anti-slip product that may be assessed for relevant external wash bays or ramps.

What information is needed for a commercial kitchen flooring quotation?

Send the area split by cooking, prep, wash, stores and corridors; the existing floor and visible failures; cleaning routine, heat and grease exposure; drain locations; photographs; and the available installation and reopening window.

Not sure which system fits your project?

Tell us your surface, area and timeline — our Singapore technical team will recommend a practical system and price it fast.