Both a concrete hardener and an epoxy coating stop a floor dusting. They do it in different ways, and the difference decides which one fits your floor.

The short answer

  • Hardener: the slab is sound, the problem is dust and stains, and the floor can stay the colour of concrete.
  • Epoxy: the floor needs colour, line marking, a thicker wearing layer or resistance to specific chemicals.

Side by side

Concrete hardenerEpoxy floor coating
What it leavesA hardened surface with a thin, clear filmA coloured resin layer on top of the slab
Rayson productTopShield CH460-SFloorGuard EP310 (roller) or EP320 (self-levelling), over PrimeBond EP110
MaterialAbout 0.35 kg/m², three coatsMore, by system; see each data sheet
Colour and markingClear onlyColours, zones and line marking
Levels a rough floorNoSelf-levelling epoxy does
Existing floorsYes, new and old concreteYes, on prepared sound concrete
Foot traffic12 hours after the last coatBy product; see the data sheet
Watch forDoes not bridge cracks; can be slippery when wetMore preparation and a longer shutdown

Choose a hardener when

  • The concrete is firm and flat enough to use as it is.
  • Dust on stock, racking or machines is the main complaint.
  • The area cannot close for long. Coats go on 4 to 24 hours apart.
  • A concrete look is acceptable.

TopShield CH460-S penetrates and binds the surface, then builds a thin hard film. Because it forms its own wear surface, the result depends less on the quality of the slab than a conventional silicate hardener does. The full system and its limits are on the concrete floor hardener page.

Choose epoxy when

  • Aisles, walkways and zones must be coloured or marked.
  • The surface is worn or rough and needs a new wearing layer.
  • The floor meets oils, solvents or process chemicals that call for a tested system.
  • The floor must look uniform, with repairs hidden.

The systems and formats are on the epoxy flooring page, and prices by system are in the epoxy flooring price guide.

Use both, by zone

One building rarely needs one answer. A typical warehouse split:

  1. Racking and storage bays: clear hardened concrete.
  2. Main forklift aisles and turning areas: self-levelling epoxy.
  3. Walkways and safety zones: coloured epoxy or line marking.
  4. Wash bays and wet process areas: PU-cement screed.

Zoning puts the heavier system only where the traffic needs it. The method is set out in choosing a warehouse floor coating by traffic class.

What neither does

  • Neither fixes a damp slab. Both need dry concrete. For the hardener, that means a moisture content below 8%.
  • Neither replaces repairs. Cracks, potholes and broken joint edges are repaired first.
  • Neither is right for hot wash-down. That is a PU-cement screed.