Rayson TopShield Ceramic hybrid Interior

Rayson TopShield CH460-S

Rayson TopShield CH460-S is a two-part, clear inorganic–organic hybrid coat that penetrates concrete and cures to a hard, dust-free, stain-resistant surface, used as a floor hardening system or as the primer coat under TopShield CH465-S.

Best for

Best for hardening and dust-proofing warehouse, factory and car park slabs in thin coats, without a thick film.

Product packaging · Interactive depth view Rayson TopShield
Rayson TopShield CH460-S pail and label
Move to inspect the product
Product system Rayson TopShield CH460-S
18 kg set: Part A 15 kg, Part B 3 kg RY-TDS-CH460
Why specify Rayson TopShield CH460-S

Rayson TopShield CH460-S has one clearly defined, verifiable job in the coating system.

Rayson TopShield CH460-S is a two-part, clear inorganic–organic hybrid coat that penetrates concrete and cures to a hard, dust-free, stain-resistant surface, used as a floor hardening system or as the primer coat under TopShield CH465-S. Best for hardening and dust-proofing warehouse, factory and car park slabs in thin coats, without a thick film.

01

Penetrates and binds the concrete surface

Hardening and dust-proofing concrete floors in warehouses, factories and car parks

02

Hard, abrasion-resistant, dust-free finish

Clear sealing of concrete and cement mortar floors in offices and plant areas

03

Stain-resistant and easy to clean

Primer coat under TopShield CH465-S clear top coat

Illustrative scene: a warehouse slab half treated with a clear hardener, dense and dust-free with a soft sheen beside pale dusty concrete, a worker rolling along the boundary and a floor polishing machine behind, with TopShield CH460-S Part A and Part B in front
Concrete hardener and dustproofing

Three thin coats. A dust-free slab.

A two-part clear hybrid that penetrates concrete and cures to a hard, dust-free, stain-resistant surface. Coat 1 by roller at 0.15 kg/m², polished after at least 4 hours, then two coats at 0.10 kg/m² each.

From substrate to service

A controlled route to applying Rayson TopShield CH460-S.

This sequence supports early planning. It does not replace the current Technical Data Sheet, approved method statement or project-specific technical review.

  1. 01

    Inspect and prepare the substrate

    New (fully cured) and old concrete, cement mortar and screed; moisture content below 8%

  2. 02

    Prepare the material as specified

    Shake or stir each part. Mix Part A : Part B = 5:1 by weight (15 kg : 3 kg) for 2 minutes with a slow-speed mixer (about 600 rpm). Use within 40 minutes at 20 °C — sooner in hot weather. Do not dilute.

  3. 03

    Apply with the correct tools

    Recommended methods: Roller, Rubber rake, Brush, Airless spray. Confirm coat count and thickness for the project.

  4. 04

    Protect through the required cure

    Foot traffic and light work after 12 hours; full hardness after 72 hours at 20 °C.

Coating system cutaway

Every layer has a job—from prepared substrate to service surface.

This diagram explains a typical system position, not a fixed specification. Primer, body coat, finish, thickness and detailing must be confirmed for the project.

Position in the system Standalone coating

Rayson TopShield CH460-S serves as the standalone coating. Confirm the complete build-up against the substrate, exposure and project requirements.

Related system products

Review primers, body layers, finishes or specialist components connected to this product.

  1. Rayson TopShield CH460-SStandalone coating · Ceramic hybrid
  2. Compatible body coat / baseProvides the required thickness and continuity beneath the finish
  3. Approved primer / baseIncluded when required by the system design
  4. Correctly prepared substrateNew (fully cured) and old concrete, cement mortar and screed; moisture content below 8%
Technical planning data

Four project facts for faster system screening.

These current product figures support early selection. Confirm the final build-up, quantity and application conditions against the Technical Data Sheet and site conditions.

Coverage
Coverage

Hardening system: coat 1 at 0.15 kg/m², coats 2 and 3 at 0.10 kg/m² each (0.35 kg/m² in total). As a primer coat: 0.10–0.15 kg/m².

Mixing & working time
Mixing

Shake or stir each part. Mix Part A : Part B = 5:1 by weight (15 kg : 3 kg) for 2 minutes with a slow-speed mixer (about 600 rpm). Use within 40 minutes at 20 °C — sooner in hot weather. Do not dilute.

Drying & curing
Curing

Foot traffic and light work after 12 hours; full hardness after 72 hours at 20 °C.

Pack configuration
Pack

18 kg set: Part A 15 kg, Part B 3 kg

Suitability check

Confirm the substrate and real service environment before specifying.

02

Choose something else when

  • Substrate must be dry (moisture content below 8%), clean and repaired before coating
  • Use mixed material within its pot life; pot life is shorter in hot weather and in large batches
  • Thin-film system — it does not level rough concrete or bridge moving cracks
  • Polished, hardened floors can be slippery when wet — assess slip resistance for wet areas
  • Always complete a test area on existing coatings and stone
  • Levelling rough concrete or bridging moving cracks
  • Damp substrates or concrete with moisture content of 8% or more
  • Wet areas where slip resistance has not been assessed
Substrate requirements
  • New (fully cured) and old concrete, cement mortar and screed; moisture content below 8%
  • Existing epoxy floors and natural stone such as marble — test area first
  • Other substrates: confirm suitability with the technical team
Technical documents and project support

Ready to specify Rayson TopShield CH460-S? Give Rayson the site conditions.

Send the area, substrate condition, expected traffic or exposure, required finish and programme. The technical team can help review the system build-up and estimated quantity.

Common technical questions

What to know before specifying Rayson TopShield CH460-S.

How is TopShield CH460-S different from a silicate concrete hardener?

It pairs an inorganic backbone, for hardness and abrasion resistance, with an organic component for adhesion and toughness. Because it forms its own thin wear surface, the result depends less on slab quality than with a conventional silicate hardener.

How is the hardening system applied?

Three thin coats: coat 1 by roller at 0.15 kg/m², then after at least 4 hours polish and burnish with a floor polishing machine, then coats 2 and 3 at 0.10 kg/m² each by rubber rake, roller or airless spray, at least 4 hours apart — 0.35 kg/m² in total. Never apply one heavy coat.

When can the floor be used?

Foot traffic and light work after 12 hours; full hardness after 72 hours at 20 °C.

Will a hardened floor be slippery?

Polished, hardened floors can be slippery when wet, so assess slip resistance for wet areas before specifying. Rayson does not publish a slip rating for this product.

Can it go over an existing epoxy or stone floor?

The data sheet lists existing epoxy floors and natural stone such as marble as substrates, but always complete a test area first. It is a thin-film system: it does not level rough surfaces or bridge moving cracks.

Is TopShield CH460-S available to order now?

TopShield CH460-S is part of the Rayson ceramic-hybrid (CH) range, expected in November 2026, and its data sheet is still a draft; test figures for hardness, abrasion and chemical resistance are not yet published. Send your project details and required date, and Rayson will confirm supply timing and quantities before you commit.

Related products

Rayson TopShield CH465-S — Top coats & sealers
Finish TopShield

Rayson TopShield CH465-S

Clear top coat · 18 kg set

Rayson TopShield CH465-S is a two-part, clear inorganic–organic hybrid top coat that cures to a hard, stain-resistant wearing surface on concrete, Rayson ceramic-hybrid (CH) colour systems and existing resin floors.

Surfaces
Concrete, Cement screed
Chemistry
Ceramic hybrid
Rayson PrimeBond CH145-S — Primers & bonding coats
Prime PrimeBond

Rayson PrimeBond CH145-S

Two-part · 3:1 by weight

Rayson PrimeBond CH145-S is a two-part primer that consolidates weak, dusty or aged concrete and anchors the Rayson ceramic-hybrid (CH) colour and clear coats — FloorGuard CH340-W and TopShield CH465-S — to it.

Surfaces
Concrete, Cement screed
Chemistry
Ceramic hybrid
Rayson PatchBond EP220 — Repair mortars & compounds
Repair PatchBond

Rayson PatchBond EP220

Two-part epoxy repair system

Rayson PatchBond EP220 is a two-component, solvent-free thixotropic epoxy adhesive and repair compound with exceptional sag resistance that bonds and fills on vertical, overhead and even mat-damp concrete surfaces.

Surfaces
Concrete, Walls
Chemistry
Epoxy