Penetrates and binds the concrete surface
Hardening and dust-proofing concrete floors in warehouses, factories and car parks
Rayson TopShield CH460-S is a two-part, clear inorganic–organic hybrid coat that penetrates concrete and cures to a hard, dust-free, stain-resistant surface, used as a floor hardening system or as the primer coat under TopShield CH465-S.
Best for hardening and dust-proofing warehouse, factory and car park slabs in thin coats, without a thick film.
Rayson TopShield CH460-S is a two-part, clear inorganic–organic hybrid coat that penetrates concrete and cures to a hard, dust-free, stain-resistant surface, used as a floor hardening system or as the primer coat under TopShield CH465-S. Best for hardening and dust-proofing warehouse, factory and car park slabs in thin coats, without a thick film.
Hardening and dust-proofing concrete floors in warehouses, factories and car parks
Clear sealing of concrete and cement mortar floors in offices and plant areas
Primer coat under TopShield CH465-S clear top coat
A two-part clear hybrid that penetrates concrete and cures to a hard, dust-free, stain-resistant surface. Coat 1 by roller at 0.15 kg/m², polished after at least 4 hours, then two coats at 0.10 kg/m² each.
This sequence supports early planning. It does not replace the current Technical Data Sheet, approved method statement or project-specific technical review.
New (fully cured) and old concrete, cement mortar and screed; moisture content below 8%
Shake or stir each part. Mix Part A : Part B = 5:1 by weight (15 kg : 3 kg) for 2 minutes with a slow-speed mixer (about 600 rpm). Use within 40 minutes at 20 °C — sooner in hot weather. Do not dilute.
Recommended methods: Roller, Rubber rake, Brush, Airless spray. Confirm coat count and thickness for the project.
Foot traffic and light work after 12 hours; full hardness after 72 hours at 20 °C.
This diagram explains a typical system position, not a fixed specification. Primer, body coat, finish, thickness and detailing must be confirmed for the project.
Rayson TopShield CH460-S serves as the standalone coating. Confirm the complete build-up against the substrate, exposure and project requirements.
Review primers, body layers, finishes or specialist components connected to this product.
These current product figures support early selection. Confirm the final build-up, quantity and application conditions against the Technical Data Sheet and site conditions.
Hardening system: coat 1 at 0.15 kg/m², coats 2 and 3 at 0.10 kg/m² each (0.35 kg/m² in total). As a primer coat: 0.10–0.15 kg/m².
Shake or stir each part. Mix Part A : Part B = 5:1 by weight (15 kg : 3 kg) for 2 minutes with a slow-speed mixer (about 600 rpm). Use within 40 minutes at 20 °C — sooner in hot weather. Do not dilute.
Foot traffic and light work after 12 hours; full hardness after 72 hours at 20 °C.
18 kg set: Part A 15 kg, Part B 3 kg
Send the area, substrate condition, expected traffic or exposure, required finish and programme. The technical team can help review the system build-up and estimated quantity.
It pairs an inorganic backbone, for hardness and abrasion resistance, with an organic component for adhesion and toughness. Because it forms its own thin wear surface, the result depends less on slab quality than with a conventional silicate hardener.
Three thin coats: coat 1 by roller at 0.15 kg/m², then after at least 4 hours polish and burnish with a floor polishing machine, then coats 2 and 3 at 0.10 kg/m² each by rubber rake, roller or airless spray, at least 4 hours apart — 0.35 kg/m² in total. Never apply one heavy coat.
Foot traffic and light work after 12 hours; full hardness after 72 hours at 20 °C.
Polished, hardened floors can be slippery when wet, so assess slip resistance for wet areas before specifying. Rayson does not publish a slip rating for this product.
The data sheet lists existing epoxy floors and natural stone such as marble as substrates, but always complete a test area first. It is a thin-film system: it does not level rough surfaces or bridge moving cracks.
TopShield CH460-S is part of the Rayson ceramic-hybrid (CH) range, expected in November 2026, and its data sheet is still a draft; test figures for hardness, abrasion and chemical resistance are not yet published. Send your project details and required date, and Rayson will confirm supply timing and quantities before you commit.
Clear top coat · 18 kg set
Rayson TopShield CH465-S is a two-part, clear inorganic–organic hybrid top coat that cures to a hard, stain-resistant wearing surface on concrete, Rayson ceramic-hybrid (CH) colour systems and existing resin floors.
Two-part · 3:1 by weight
Rayson PrimeBond CH145-S is a two-part primer that consolidates weak, dusty or aged concrete and anchors the Rayson ceramic-hybrid (CH) colour and clear coats — FloorGuard CH340-W and TopShield CH465-S — to it.
Two-part epoxy repair system
Rayson PatchBond EP220 is a two-component, solvent-free thixotropic epoxy adhesive and repair compound with exceptional sag resistance that bonds and fills on vertical, overhead and even mat-damp concrete surfaces.
Rayson assistant
Answers from Rayson's own product information
Guidance only — confirm specifications with the Rayson technical team.