1. Product description

Rayson PrimeBond CH145-S is a two-part primer that consolidates weak, dusty or aged concrete and anchors the Rayson ceramic-hybrid (CH) colour and clear coats — FloorGuard CH340-W and TopShield CH465-S — to it.

Rayson PrimeBond CH145-S is a two-part primer that consolidates weak, dusty or aged concrete and anchors the Rayson ceramic-hybrid (CH) colour and clear coats to it.

2. Recommended uses

  • Priming weak, dusty or aged concrete under the Rayson ceramic-hybrid (CH) system
  • Old concrete floors to be finished with TopShield CH465-S clear top coat
  • Refurbishment of car park, warehouse and factory floors
  • Sealing prepared concrete before crack and pinhole repairs

3. Suitable substrates

  • Aged, weak or porous concrete and cement screed after mechanical preparation; moisture content below 8%
  • Sound concrete where a two-part primer is specified
  • Other substrates: confirm suitability with the technical team

4. Key properties

  • Two-part reactive primer for weak, dusty or aged concrete
  • Consolidates the surface and seals porosity
  • Simple 3:1 mixing ratio by weight
  • Base for FloorGuard CH340-W colour coat or TopShield CH465-S clear top coat
  • Roller or brush applied, undiluted

5. System role

Primer.

Rayson TopShield CH465-S clear top coat 1–2 coats · 0.10 kg/m² each Rayson FloorGuard CH340-W colour coat Coloured systems · 2 coats Rayson PrimeBond CH145-S primer This product · about 0.15 kg/m² Prepared concrete substrate Ground back to firm concrete, vacuumed

Figure 1 — Typical system build-up (top to bottom). Layer thicknesses are system-dependent; confirm the specification for your project.

6. Technical data

Surface preparation Concrete must be dry and clean, with moisture content below 8%. Grind, sand or blast to remove laitance, friable material, dust, oil, old coatings and efflorescence until firm concrete is reached, then vacuum thoroughly. Preparation decides the result — do not coat over dust or contamination.
Mixing / dilution Two parts, 3:1 by weight (Part A : Part B). Add Part B to Part A and mix with a slow-speed electric mixer until uniform. Mix only what can be applied promptly — working time shortens in hot weather. Do not dilute with water or thinner.
Application method Roller, Brush
Coverage About 0.15 kg/m² in one coat (0.10–0.15 kg/m², depending on porosity)
Application conditions Apply to a dry substrate at least 3 °C above dew point. Protect from rain, water and condensation until dry. Ventilate enclosed areas.
Drying & curing Allow to dry fully before repairs or the next coat — at least 2 hours in normal conditions. Drying is slower in cool or humid conditions. FloorGuard CH340-W after a minimum of 2 hours, once fully dry; TopShield CH465-S after a minimum of 4 hours.
Recoat interval FloorGuard CH340-W: after a minimum of 2 hours, once fully dry. TopShield CH465-S: after a minimum of 4 hours.
Film / thickness Penetrating primer; consumption governs film.
Pack sizes Two-part set, Part A : Part B = 3:1 by weight. Confirm set size with the Rayson technical team. TECHNICAL REVIEW REQUIRED
Storage Store sealed in original packaging in a cool, dry, shaded place at 5–30 °C. Keep away from heat and direct sunlight.
Shelf life See batch label; use unopened material within the stated period. TECHNICAL REVIEW REQUIRED

7. Application workflow

1 Inspect Assess substrate & co… 2 Prepare Mechanical prep, repa… 3 Mix Full packs, correct r… 4 Apply Within pot life & con… 5 Recoat Within recoat window 6 Cure Before return to serv…

Figure 2 — Application workflow. Each stage is a hold point: confirm the previous stage is complete and within specification before proceeding.

8. Recommended system

Coloured floor system — weak concrete

  1. Prepare and vacuum the concrete, then prime with one coat of Rayson PrimeBond CH145-S at about 0.15 kg/m²
  2. Once dry, repair cracks and pinholes with Rayson PatchBond EP220 epoxy repair compound
  3. Apply two coats of Rayson FloorGuard CH340-W colour coat, at least 2 hours apart
  4. After 24 hours, seal with one coat of Rayson TopShield CH465-S clear top coat

Clear system on old concrete

  1. Grind, repair and vacuum the old concrete floor
  2. Prime with one coat of Rayson PrimeBond CH145-S at about 0.15 kg/m²
  3. Apply two coats of Rayson TopShield CH465-S clear top coat at 0.10 kg/m² each, at least 4 hours apart

9. Limitations

10. Health & safety

Two-part reactive product. Wear gloves and eye protection and ensure good ventilation, particularly when spraying. Avoid skin and eye contact — reactive resins can irritate and sensitise skin. Keep away from heat and ignition sources. Keep out of reach of children. Consult the Safety Data Sheet (in preparation) before use.